FoPV Work Morning Roundup - Thursday 12th Novemnber 2026

5 days ago
3 min read

Hello Conservation Volunteers


There was a great turnout down in Bingham Park bottom for our latest work morning on what was a lovely frosty and sunny morning where we were also joined by some volunteers from the Bingham Park Community Group conservation team.


The Parks team had already dropped off tools and equipment before we arrived for our main task which was to repair the rope and post fencing over 5 separate sections where some (most!) posts were loose and some broken and it all needed a good tidying up.


The broken posts are never on the end though; they were generally in the middle of a stretch and so the first task was to undo the rope and pull it out in order to remove the broken posts and install some new ones with the aid of the post rammer. The first noticeable issue was the size of the new posts, being longer and thicker than the original posts (apparently the small posts were currently unavailable to buy). For it not to look too odd, it was decided to put new posts all on one end of the section being worked on which actually meant undoing and removing original posts from one end to use in the middle!


Any original loose posts were either repositioned or "banged" back in to firm them up.


Once installed each new post then required drilling out and finally the rope could be threaded through to finish. All 5 sections were done.


Whilst the post fixing was going on various other tasks were taking place....


One team went down where the old brick Parks store used to be (demolished a few years ago). The planted beech hedge which had stood behind it had looked out of place in the semi-park environment, and it had been agreed to thin and remove some and let light in by removing the weaker, straggly ones, and look less like a hedge! These have been thinned out.


Elsewhere, Peter was on a one-man mission finding all the grates and drains which should drain into the river to remove the years of soil which were bunging them up. The soil was soft and could be dug out easily, but although he managed to remove a few feet at the top of each one, they really need a high-powered drain jet wash to clear the rest of the drain or maybe rodding from the river side to free them up.


Path edges were also scraped to remove the build-up of soil.


Finally, an open area which continues to defy anything to grow on it was tackled again. It is very stony, rotavating it a couple of years ago to seed proved troublesome, however a team have given it a light raking and thrown down some woodland seed mixture we had left over. A pole has been put in, and a sign will be fixed to it to highlight the seeding area. We will keep our fingers crossed and hope some seeds take next year.


And that was that...almost....once everybody had gone and I was tidying up ready for Parks to pick up the tools I found a flapjack bar at the bottom of the box which the rope came in. Thinking at first somebody had forgotten it, on finding a leaflet from the supplier I realised it was a freebie from the supplier of the rope. Unfortunately, nobody was around to share it with....it was very tasty, bit like an almond slice with flapjack!


A massive thank you to everybody who came along and to Andy and the Parks team for arranging and transporting the equipment (especially the rope with the flapjack bar!). 


(For anybody who would like to help with the Bingham Park Community Group conservation team currently on Saturday mornings once a month contact Tom Harrison at Tom Harrison <tomdharrison2@gmail.com>)


The next work morning is on Thursday 12th November. An email will be sent out nearer the time with details.


Lyndon


A Selection of photos from the work morning


Section one underway with new posts in and being drilled


Section two team Chris and Keith working on another section with Mick looking on


Teams working on section 3 and 4


Section 5 before with broken posts


Mick and Ian installing a new post on section 5


Rebecca drilling - Ian doesn't look convinced!


Peter working on the drains


The beech hedge before....


....and after


Section one with new posts and rope


Section two completed


Section three completed


Section four completed


...and finally section five completed


The seeded area with leaves covering it up and a post ready for a sign


Keith went back later to tidy up the rope ends like this....